Feasibility Parameter | Definition | On-site Training (Jan-Dec 2020) | VLE Training (Jan-Jun 2021) |
---|---|---|---|
Accessibility and learner engagement | Number of learners trained | 55 | 104 |
Cost-effectiveness | Cost of training | 175 USD | 375 USD |
Instructor engagement | Instructors’ time engagement | 24 h | 30 h |
The ratio of the number trained and hours of engagement | 2.2916 | 3.4667 | |
KOI for the Unacceptable Sample | Samples received | 5220 | 3920 |
DBS not soaked properly | 29 | 5 | |
Less than 2 complete circles in a filter | 9 | 6 | |
Sample quantity not sufficient for analysis | 5 | 3 | |
Clotted sample | 1 | 1 | |
Serum rings | 0 | 0 | |
The sample was not dried properly | 0 | 0 | |
Contaminated sample | 0 | 0 | |
Total unacceptable samples | 44 (0.84%) | 15 (0.38%) |